Call For Papers For ASHRAE 2014 Annual Conference
2013-05-30
To meet electricity demands throughout the summer, the 24MW temporary rental power plant will supply power to the electricity grid at a time when there is a significant increase in the use of temperature control equipment, such as air conditioning and district cooling.